Sprint Objectives
NLDigital Amplification Loop (Day 1-5)
Workshop delivered Tue 5/19. 14-day amplification kicks off. @amplification-liaison drafts reposts; Frank ratifies. CRM touchpoints logged.
Newsletter Issue 1 ships Friday 5/22
Resend wired. /newsletter/archive route + double-opt-in HMAC token. First issue is Issue 1 — don't backfill placeholders. The forcing function for the publishing layer.
Inner Circle June 1 Launch Prep
Inner Circle = primary gravity for June 1. Three waitlist surfaces locked: /inner-circle (primary), /newsletter (secondary), /waitlist?ref= (tertiary).
Build @integrity-guard agent
Automates the rules from Mon 5/19 integrity sweep. Brand voice check, AI-slop detection, claim audit, schema validation. Pre-publish gate.
Madrid W22 Prep + W21 Healthcheck
Adigital + 1 enterprise must confirm by Thu 5/22 (T-5 to Wed 5/27 wheels-up). Trip pivots to network visit if no confirms.
Site Foundations Sprint (2026-05-20)
Autonomous 2h sprint: tsconfig scope fix, brand violation cleanup, 3 new commands (/hub-audit /traffic-week /newsletter-week), @integrity-guard agent, CLAUDE.md + AGENTS.md refresh, handover doc.